Showing posts with label 150 North Riverside. Show all posts
Showing posts with label 150 North Riverside. Show all posts

Wednesday, August 28, 2013

Chicago Under Construction: The Park at River Point Makes Train Tracks Disappear

click images for larger view
For the better part of the past century, north from Lake Street was where the Chicago River began to again show its natural roots.  To the east and south, the river had long before a constructed ditch with towers on either bank often coming right to the edge.
At Wolf Point, however, and along the western bank, the river retained what at least appeared to be a natural shoreline, hugged by trees, shrubs and plants that arose free from the guiding hand of any landscape architect.  For those long decades, this assuming structure, just north of Lake Street, was the most ambitious building on the site . . .
All that's history now.  There are big plans for all those last empty sites along the river in the Loop.  No fewer than three buildings are planned for Wolf Point, and renderings of a new office tower at 150 North Riverside were unveiled just last month.

That brick Metra building - and the ramshackle wooden stairway leading down to the river -  is now only a memory, as another massive tower, River Point, is about to go up in their place.  It's been designed for Hines Interests by Pickard-Chilton, architects of the 60-story 300 North LaSalle, completed in 2009.  The actual building, to be set back from the river along Canal Street, has yet to break ground.
First the developer is creating a 1.5 acre riverfront park, for which they've shook down the city for a $29.5 million TIF subsidy.  (150 North Riverside, to be constructed on the other side of Lake, is also making a riverfront park part of their project, but without recourse to TIF money.)  The park at River Point is being built over the existing train tracks leading into Union Station.
On a chilly day back in April, a painter was already documenting the vanishing surface tracks clinging to the river.
Soon, the construction equipment was rolling into place.
Things begin, slowly and deliberately . . .
. . . cranes flew in on barges . .  .
. . . basic contours began to reveal themselves . . .
. . . and by July, there was no longer any mistaking but that this was the start of something big.

By August, there was enough green rebar in sight it might as well been St. Patrick's Day.
 The irregular riverbank has already been replaced with a new river wall . . .
 
. . . even as concrete walls quickly began to rise to support the surface of the new park, and swallow up the accustomed, almost lullaby sound of locomotive bells forever . . .
When it's all done, it will look something like this . . . 
Read More:
Hour of the Wolf: The Transformation of the Pivot Point of Chicago
First Renderings for 150 North Riverside office tower and park

Wednesday, July 17, 2013

Giant Punch Stamp on the River? First Renderings for 150 North Riverside office tower and park - Revealed and Considered

click images for larger view
150 North Riverside and date stamp - separated at birth?

Is a new real estate bubble rising around the Chicago River?  Long dormant land in and around Wolf Point is already under construction with two major skyscrapers, and this morning, in an email to his constituents, 42nd Ward Alderman Brendan Reilly unveiled the first renderings I've seen of the proposed office tower for 150 North Riverside, to be built on air rights over tracks leading into Union Station . . .

. . . just east of Graham Anderson, Probst and White's 1922 Butler Brothers warehouse II.
I actually worked for 6 years on its top floor before it was converted by Hartshorne Plunkard into the Randolph Place Lofts.  Unlike its twin building to the south, which was made into - and remains - offices - it's now housing, and the residential nature of Randolph Place may be a key reason while 150 North Riverside is placed in the middle of the site.  The Trib's Blair Kamin is tweeting Goettsch Partners is responsible for the design.
The 1.2 million square foot building is being pushed by long-time John Buck veteran John O'Donnell, now of the Chicago operations of Colliers International.  An April article by Ryan Ori in Crain's Chicago Business reported O'Donnell had given up a request for $20 million in TIF funding to get approval for the project moving forward.  River Point, currently under construction along the river across the street, got $29.5 million in TIF money to cover over the Metra tracks and create a riverfront park.  Instead, O'Donnell wants the city to give him a slice of land worth $4-5 million the city controls to make his site complete.  The rest of it was purchased for $12.5 million in 2011.

According to Crain's, Reilly had been fighting an earlier proposal because the park component wasn't at ground level.  In the rendering released in his email, the park remains entirely at the elevated street level, with no riverbank component
Boeing riverwalk
Across Randolph Street to the south, at the Boeing World Headquarters (originally designed by Perkins+Will in 1990 for Morton Salt), the riverside esplanade is split into two, relatively narrow parts, one above-grade, at the level of Randolph and Lake streets, with another narrow strip descending all the way down to the river. In the 150 Riverside rendering, the plaza space is all at street level, with a larger portion south of Lake tucked beneath the angled cantilevers of the building.
park at River Point
Across the street to the north, on the other side of Lake Street, renderings of the park building built along the river as part of the River Point shows, as at Boeing, a park split between ground and street level.  The ground level links to a riverside esplanade at the River Bend residential tower to the north. The difference is the River Point site is actually set back to the west, parallel to where the Butler Brothers building is sited to the south.  The park itself is to be a built over what looks to be pretty much the whole expanse of the Metra tracks, making the acre-and-a-half park much larger than what's possible at 150 North Riverside.  (Don't be fooled by the rendering, which is drawn from an exaggerated wide-angle perspective that makes the park look only slightly smaller than Yellowstone.)
150 North Riverside
I get what Ald. Reilly is looking for, a continuous riverwalk from River Point to the elevated plaza of the old Daily News Building.  It would require the addition of under-the-bridge linking components, but it would offer up something similar to continuous Riverwalk now under development for the south bank of the river from Lake to Wabash.   The problem, of course, is that it could only go to the old Daily News Building (now Riverside Plaza), at Madison, where the riverwalk south to Jackson is all elevated at street level.  (And let's hope 150 North doesn't give Sam Zell ideas about resurrecting his old plan to build over the Daily News Plaza.  Surprise, surprise, the Commission on Chicago Landmarks has never gotten around to landmarking this essential Chicago building.)
Daily News Building (Riverside Plaza) meets the river
So for continuity, you want a large part of the park at 150 North Riverside to be at an elevated level so it will link it to the existing river walkways north and south.  If you want to split off a walkway along the river, it would have to be somewhat narrow, and, as at Boeing, it's hard to find a graceful way to get people to the lower level without a vertiginous shotgun stairway.  In addition, the 150 North Riverside rendering also shows the space along the river beneath the plaza to be inhabited with some function not clearly apparent.

As for the building itself, if it weren't for the angled cantilever at the bottom, it really doesn't have much to distinguish itself visually at all and, at first glance, I'm not even sure the cantilever works.  There seems to be a lot of tall, tall concrete at the base.  Dear readers, what's your take?

In any event, more should learned from the public hearing.  Welcome to the arena, Mr. O'Donnell.


42nd ward alderman Brendan Reilly is sponsoring a public meeting for his constituents on 150 North Riverside, 6:00 p.m., July 31st in Walnut Ballroom of the Hotel Allegro, 171 West Randolph.
Read More:


Hour of the Wolf:  The Transformation of the Pivot Point of Chicago

The Daily News Building Plaza: Endgame for one of Chicago's Great Public Spaces?